The axis is 19 km long, it contains 15 bridges (including the Nile Bridge with a length of 1.2 km) and 11 tunnels.
The project consists of 16 bridges and tunnels including a bridge crossing Nile with length of 920 meters
Saft El Labn Axis, with a total length 4250 ml. The project starting date is 1st June, 2007
The length of the axis is 26 km; it contains 16 bridges , including the Nile Bridge with a length of 920m and 6 tunnels
Total business volume in Egyptian pound: 550 million pounds (five hundred and fifty million pounds)
The length of the axis is 7 km, it contains 4 bridges (including the Nile Bridge with a length of 500m) and 3 tunnels
Planning and Designing
Total business volume in Egyptian pound: 80 million pounds (eighty million pounds)