The axis is 19 km long, it contains 15 bridges (including the Nile Bridge with a length of 1.2 km) and 11 tunnels.
The project consists of 16 bridges and tunnels including a bridge crossing Nile with length of 920 meters
The geometrical and structural design of the 1ST ring road in Makkah includes 7 free intersections.
Total business volume in Egyptian pound: 600 million pounds
The length of the axis is 132 km, it contains 21 bridges and 8 tunnels